Shawnee Hills Storm Sewer, Phase I

Greene County Engineer & Silver Creek Township

Xenia, Ohio

The project originally involved over 20,000' of storm sewer, some as large as 45".  The estimated construction cost of this project was over $900,000.  The Issue II funding fell short and the Township received only $250,000.  Rather than decline the monies, the drawings were phased and revised Phase I was constructed.

 

The waterline in the project area is transite and the area involved is extremely flat.  These issues created some very serious design and construction problems, which were overcome by everyone involved cooperating.  One thousand feet of 48" ADS, N-12 pipe was used in this project and was the longest run of this size pipe that the manufacturer had installed.

 

Therefore the Township received the benefit of some additional attention.  The construction went relatively well and the system is functioning as designed.  JWCI performed the route selection, flow calculations, design and some construction administration.