To provide the Village of Lynchburg with a new 250 thousand gallon above ground storage system and remove the 100 thousand gallon system. (Click on each picture for a closer look.)

Lynchburg 2.JPG (175462 bytes) 1.  Jim Jones, Village Engineer, along with Angel Balon, Village Clerk, review Bid Opening documents for the project.
LYNCHGBURG 2.JPG (132062 bytes) 2.  Existing water tower has 100 thousand gallon capacity, is very old and badly in need of repair.
Lynchburg 3.JPG (342318 bytes) 3.  Foundation footer - 5 were required and one to support the downcomer.
Lynchburg4.JPG (240769 bytes) 4.  Altitude valve install at base of tower.
Lynchburg 5.jpg (258982 bytes) 5.  New tower on Sunday, first section of 5 legs installed with downcomer.
LynchburgWaterTower2.jpg (291730 bytes) 6.  New tower as it looked on that Friday evening, with 250 thousand gallons of storage capacity.